Dahua Group Dalian Boer Chemical Engineering Co., Ltd. |
100kt/a sulfuric acid plant based on sulfur |
Turnkey Project |
3+2 Double-Contact Double-Absorption, Thermal Recovery, Re-Use Of Waste Heat |
Design, Manufacture, Erection Debugging & Start-Up |
Guizhou Kailin Group Mining Fertilizer Co., Ltd |
800Kt/a Sulfuric acid plant based on sulfur |
Turnkey Project |
3+2 Double-Contact Double-Absorption, Thermal Recovery, Power Generation By Waste Heat |
Design, Manufacture, Erection Debugging & Start-Up |
Shanghai Pengxin Group Co., Ltd. |
70kt/a sulfuric acid plant based on sulfur in Congo |
Turnkey Project |
3+1 double-converse double absorption, waste heat recovery, demineralized water system |
Design, Manufacture, Erection Debugging & Start-Up |
Goldstar Chemical Engineering Group |
150kt/a sulfuric acid plant based on sulfur |
Turn Key Project |
3+2 Double-Contact Double-Absorption, Thermal Recovery, Re-Use Of Waste Heat |
Design, Manufacture, Erection Debugging & Start-Up |
Sichuan Wudu Mining Corporation |
60kt/a sulfuric acid plant based on sulfur |
Turn Key Project |
3+2double-converse double absorption, thermal recovery, demineralized water system |
Design, Manufacture, Erection Debugging & Start-Up |
Wylton (China) Chemical Industrial Co., Ltd |
800Kt/a Sulfuric acid plant based on sulfur |
Turnkey Project |
3+1 Double-Converse Double-Absorption, Thermal Recovery |
Manufacture, Installation, Debugging |
Shandong Doguide Group Co., Ltd. |
400kt/a sulfuric acid plant based on sulfur |
fuming acid production equipments |
3+2 Double-Contact Double-Absorption, Thermal Recovery, Re-Use Of Waste Heat |
Manufacture, Installation, Debugging |
LFC-LaoCaiChemicals Fertiler JSC |
400kt/a sulfuric acid plant based on sulfur |
Turnkey Project |
3+2 double-converse double-absorption, thermal recovery, re-use of waste heat, demineralized water system |
Design, Manufacture, Erection Debugging & Start-Up |
Beijing Xingyuancheng Economics and Business Co., Ltd. |
120kt/a sulfuric acid plant based on sulfur |
Turnkey Project |
3+1double-converse double absorption, waste heat recovery and demineralized water system |
Design, Manufacture, Erection Debugging & Start-Up |
China Wanbao Engineering Corporation |
30t/d 98.3% sulfuric acid and 20t/d 104.5% fuming acid production line based on sulfur |
Turnkey Project |
3+2 double-converse double absorption, waste heat recovery |
Design, Manufacture, Erection Debugging & Start-Up |
Dongying Lufang Metal Material Co., Ltd |
300kt/a sulfuric acid plant based on off-gas reclamation from copper melting |
Turnkey Project |
3+1 double-converse double absorption, |
Design, Manufacture, Erection Debugging & Start-Up |
Jiangsu Shuangchang Fertilizer Co., Ltd. |
120kt/a sulfuric acid plant based on pyrite |
Turnkey Project |
Acid Scrubbing, 3+2 Double-Converse Double-Absorption |
Design, Manufacture, Erection Debugging & Start-Up |
Xinjiang Tianye (Group) Co., Ltd |
60kt/a sulfuric acid plant based on pyrite |
Turnkey Project |
Acid Scrubbing, 3+3 Double-Converse Double-Absorption |
Design, Manufacture, Erection Debugging & Start-Up |
Jiujiang Company of Mining and Metallurgy |
80kt/a sulfuric acid plant based on pyrite |
Turnkey Project |
3+2 double-converse double absorption, boiler system, circulating water system including power generating unit |
Design, Manufacture, Erection Debugging & Start-Up |
Shache Hengchang Metallurgy Co., Ltd |
200kt/a sulfuric acid plant based on pyrite |
Turnkey Project |
3+1double-converse double absorption, circulation water system and waste water treatment |
Design, Manufacture, Erection Debugging & Start-Up |
Jiujiang Xingmao Chemistry and Science Co., Ltd. |
80kt/a sulfuric acid plant based on pyrite |
Turnkey Project |
3+2 double-converse double absorption, circulating water system |
Design, Manufacture, Erection Debugging & Start-Up |
Jiangxi Zhongjin Lead Co., Ltd. |
80kt/a sulfuric acid plant based on off-gas recovery from plumbum melting |
Turnkey Project |
3+2 double-converse double absorption |
Design, Manufacture, Erection Debugging & Start-Up |
Xinhua Pharmaceutical (Shouguang) Co., Ltd. |
30kt/a reducing agent device |
Turnkey Project |
|
Design, Manufacture, Erection Debugging & Start-Up |
Congo Dong Fang International Mining Sprl |
4000t/a sulfuric acid plant based on electrolytic copper |
Turnkey Project |
|
Design, Manufacture, Erection Debugging & Start-Up |
Goldstar Chemical Engineering Group |
80kt/a extending to 120kt/a sulfuric acid plant based on off-gas recovery |
Turnkey Project |
3+2 double-converse double absorption, circulating water system |
Design, Manufacture, Erection Debugging & Start-Up |
China Tianchen Engineering Corporation |
12kt/a sulfuric acid plant and 400t/a SO2 gas device |
Turnkey Project |
3+1 double-Converse Double-Absorption, tail gas treatment, circulation water system and waste water treatment system |
Design, Manufacture, Erection Debugging & Start-Up |
Weifang Yuyi Chemical Engineering Co., Ltd. |
60kt/a sulfuric acid plant and 14kt/a 65% fuming acid device |
Turnkey Project |
3+1double-converse double absorption, thermal recovery |
Design, Manufacture, Erection Debugging & Start-Up |
Liaoning Copper Group Co., Ltd. |
20kt/a sulfuric acid based on electrolytic zinc |
Turnkey Project |
3+2double-converse double absorption, thermal recovery, demineralized water system |
Design, Manufacture, Erection Debugging & Start-Up |
China Wanbao Engineering Corporation |
40t/d dilute and concentrated nitric acid production line |
Turnkey Project |
|
Design, Manufacture, Erection Debugging & Start-Up |
Chongqing Sansheng Special Construction Material Co., Ltd. |
20kt/a liquid SO2 production line |
Turnkey Project |
Sodium citrate method used for liquid SO2 generating |
Design, Manufacture, Erection Debugging & Start-Up |
Jiangxi Dingli Metal Corporation |
5000t/a sulfuric acid plant based on off-gas reclamation from molybdenum melting |
Turnkey Project |
3+1 double-Converse Double-Absorption, tail gas treatment, circulation water system and waste water treatment system |
Design, Manufacture, Erection Debugging & Start-Up |